Legislation Details

File #: WS-24-1784    Version: 1 Name:
Type: Agenda Item Status: Agenda Ready
File created: 10/16/2024 In control: Water Subcommittee
On agenda: 10/23/2024 Final action:
Title: Staff Requests that the Water Subcommittee Provide Feedback on Proposed Revisions to the Rialto Municipal Code ? 11.04.145 Moratorium on Trench Cuts in Newly Paved Streets. (ACTION) RECOMMENDATION Staff recommends that the Water Subcommittee provide feedback on proposed revisions to the Rialto Municipal Code ? 11.04.145.
Attachments: 1. Attachment 1_Ordinance 1589.pdf, 2. Attachment 2_CIty Paving Moratorium Proposed Revision with Tracked Changes.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
For Water Subcommittee Meeting October 23, 2024

TO: Honorable Water Subcommittee Members

APPROVAL: John Rossi, Interim Utilities Director

FROM: Timothy Sullivan, Public Works Director

...Title
Staff Requests that the Water Subcommittee Provide Feedback on Proposed Revisions to the Rialto Municipal Code ? 11.04.145 Moratorium on Trench Cuts in Newly Paved Streets. (ACTION)

RECOMMENDATION
Staff recommends that the Water Subcommittee provide feedback on proposed revisions to the Rialto Municipal Code ? 11.04.145.

...Body
BACKGROUND:
On May 9, 2017, the City of Rialto passed Ordinance No. 1589 (ATTACHMENT 1), which enacted a non-emergency street cut moratorium on newly improved streets. The moratorium states that the City will not allow unnecessary street cuts for five (5) years after road construction and for three (3) years after slurry sealing.

Should a street cut be made within a moratorium timeframe, the Rialto Municipal Code (RMC) dictates the required repair method that the party performing the street cut must adhere to restore the street.

ANALYSIS/DISCUSSION
Ordinance No. 1589 outlines certain situations where the paving moratorium on newly improved streets can be lifted. These exceptions are determined by the Director of Public Works/City Engineer and include:

1. Imminent endangerment of life or property.
2. Interruption of essential utility service.
3. Mandated work by city, state, or federal law.
4. Service for new development or new customers where no other reasonable means of providing service exists.

On February 28, 2024, the Water Subcommittee discussed this item. The Subcommittee directed staff to return to discuss possible revisions to the RMC that would allow for additional exceptions to the pavement moratorium. Specifically, it was discussed whether conversions from septic sewer systems to public sewers and repairs to water meter laterals should also be included as exceptions to the paving moratorium.

Staff from the Public Works Departm...

Click here for full text