Title: Request City Council 1) Select an Option for the Dog Park Design; 2) Direct staff to request a cost proposal from the Contractor and, if needed, authorize staff to release request for bids; and 3) Authorize the City Manager to sign a change order up to the staff cost estimate for the selected Option. (ACTION)
Attachments: 1. Dog Park Option A-Rendering-1.pdf, 2. Dog Park Option B-Rendering.pdf

For City Council Meeting [June 23, 2020]

TO:                                          Honorable City Council

APPROVAL:                     Rod Foster, City Manager

FROM:                     Savat Khamphou, Public Works Director/City Engineer

 

Title

Request City Council 1) Select an Option for the Dog Park Design; 2) Direct staff to request a cost proposal from the Contractor and, if needed, authorize staff to release request for bids; and 3) Authorize the City Manager to sign a change order up to the staff cost estimate for the selected Option.

 (ACTION)

 

Body

BACKGROUND:

On May 26, 2020, the City Council directed staff to bring back, within two (2) weeks, a strategy and timeline to incorporate a dog park as part of the overall Frisbie Park Project.  Staff has worked internally with the Parks Maintenance Division and with Community Works Design Group (CWDG), the project designer, to recommend a dog park concept that will be constructed and presented for the community to use in conjunction with the Frisbie Park completion and opening.

 

ANALYSIS/DISCUSSION:

Concurrent with construction of the Frisbie Park Improvements located at 598 E. Easton Street, staff is preparing the inclusion of a Dog Park in the area southerly of Easton Street.  Staff has worked internally with the Parks Maintenance Division and CWDG to provide two (2) concept plan options for a dog park.  The two (2) Design Options serve both large and small dogs, placing them within separately fenced and adjacent areas, and provides amenities needed for such a dog park.  The overall dog park project cost is estimated as approximately $139,722 or $169,635 based on the Design Option selected.

 

The two (2) Dog Park Options design details, renderings and estimated costs are outlined in Table 1, shown below and included as Attachments 1 and 2:

 

 

 

Table 1  - Dog Park Options and Estimated Costs

 

Option A - Attachment 1

 

 

 

Option B- Attachment 2

 

Based on the City Council’s Design Option selection, staff will work to deliver the selected option in conjunction with the Frisbie Park Project.  Staff will utilize various strategies to meet the timeline and cost of the selected Dog Park Design Option, as follows:

 

•                     Request a Cost Proposal from the current contractor for the Frisbie Park Project.

or

•                     Publicly Bid the Dog Park if the Contractor’s Pricing is not Acceptable.

 

The estimated completion date for the Dog Park will be by December 2020.

 

ENVIRONMENTAL IMPACT:

Construction of the Project is subject to state environmental review pursuant to the California Environmental Quality Act (CEQA).  The City, acting as the lead agency pursuant to CEQA, certified an Initial Study and a Mitigated Negative Declaration (MND) for the Project.  The MND was approved by the City on March 20, 2019, and the Notice of Determination recorded with the County Clerk, on March 21, 2019.

 

GENERAL PLAN CONSISTENCY:

Approval of this action complies with the following City of Rialto Guiding Principle:

 

Our City government will lead by example, and will operate in an open, transparent and responsive manner that meets the needs of the citizens and is a good place to do business.

Goal 2-24:                      Take advantage of opportunities to increase and enhance open spaces throughout Rialto.

 

Goal 2-27:                     Provide a variety of park facilities that meet the diverse needs and interests of the community.

 

Policy 2-27.1:                     Establish a Master Plan for Parks and Recreation that achieves a park ratio of 3.0 acres per 1,000 residents, evenly distributes park facilities throughout the community, and contains strategies for funding facilities and maintenance.

 

Policy 2-27.2:                     Plan for and designate adequate funding to maintain new and existing parks and facilities.

 

LEGAL REVIEW:

The City Attorney has reviewed and supports this staff report.

 

FINANCIAL IMPACT:

As of May 26, 2020, the project budget is $20,114,017 of which $18,299,014 of actual expenditures are on record, leaving a remaining balance of approximately $1,815,003 as shown in the Table 2 below.  Sufficient funding is available in the Frisbie Park Expansion Project budget for the request for approval from City Council for the Dog Park Project.

 

Table 2 - Project Budget Summary

 

Licensing:

This action does not require payment of a Business License tax or Administration and State fees.

 

RECOMMENDATION:

Staff requests that City Council:

 

1.                     Select Option A or Option B for the Dog Park Design;

2.                     Direct staff to request a cost proposal from the Contractor and, if needed, authorize staff to release request for bids; and

3.                     Authorize the City Manager to sign a change order up to the staff cost estimate for the selected Option.