For City Council and Rialto Utility Authority Meeting [June 9, 2020]
TO: Honorable City Council
APPROVAL: Rod Foster, City Manager
FROM: Thomas J. Crowley, P.E., Utilities Manager
Title
Request City Council to Accept the Frisbie Park Sewer Lift Station Project, City Project No. 190501; Authorize Filing of the Notice of Completion; and Authorize Release of Retention to Kirtley Construction, Inc. (DBA TK Construction).
Body
BACKGROUND
The City is currently underway with providing improvements to portions of Frisbie Park which is located at 598 E. Easton Street. This 27.4-acre site was only partially developed. The park had two restroom buildings and a snack bar on two separate septic systems. The new park will include a third restroom building and an additional snack bar building. It was the desire of the City Council to convert the existing septic systems at the park and connect the new facilities being constructed to the City's sewer collection system.
As a standalone project, Frisbie Park Sewer Lift Station project is an expansion of the existing sewer collection system and allows for the connection of Frisbie Park and the proposed Tentative Tract Map (TTM) to the sewer system. This project consisted of the construction of a sewer lift station that will accommodate the flows from the park and the TTM. Approximately 760 linear feet of 8" VCP sewer line in Easton Street will collect the flows from the park facilities to the sewer lift station, approximately 1,040 linear feet of a 8" VCP sewer line in Eucalyptus Avenue will collect the flows for the eleven lot TTM, and 1,310 linear feet of force main in Eucalyptus Avenue will connect the sewer lift station to the existing sewer collection system. In addition, the sewer lift station requires a backup generator powered by diesel in the event there is loss of power to the site.
The City Council/Rialto Utility Authority Board awarded a Construction Contract to Kirtley Construction, Inc. on September...