File #: 18-914    Version: 2 Name:
Type: Agenda Item Status: Agenda Ready
File created: 9/10/2018 In control: Transportation Commission old
On agenda: 10/3/2018 Final action:
Title: Focused Traffic Impact Analysis - Warehouse Development on the East Side of Ayala Drive at Proposed Miro Way Intersection. (ACTION ITEM)
Attachments: 1. Attachment 1 - Vicinity Map, 2. Attachment 2 - Project Site Plan, 3. Attachment 3 - Summary of Project Trip Gemeration
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
For Transportation Commission Meeting [October 3, 2018]
TO: Honorable Chairperson and Commission
APPROVAL: Robert G. Eisenbeisz, P.E., Public Works Director/City Engineer
FROM: Gene Klatt, P.E., Consultant Engineer, Lockwood Engineering

Title
Focused Traffic Impact Analysis - Warehouse Development on the East Side of Ayala Drive at Proposed Miro Way Intersection.

(ACTION ITEM)

Body
BACKGROUND:
On June 4, 2018, the first scoping agreement was submitted for the proposed warehouse development on the east side of Ayala Drive at the proposed intersection with Miro Way. On June 12, 2018, the City Council placed a moratorium on trucks along Ayala Drive from Baseline Road north to the SR-210 as an urgency item. On July 17, 2018, the 1st TIA was submitted reviewed and review comments prepared. On July 24, 2018, the City Council extended the urgency Ordinance removing Ayala Drive from Baseline Road north to the SR-210 Freeway as a truck route until June of 2019 to allow for more study and a potential General Plan/Specific Plan Amendment. July 25, 2018, the project was presented to the Economic Development Committee (EDC) because the Ayala Drive truck route had been removed and staff sought input from the EDC on allowing a truck-oriented business on a roadway where the City Council was trying to limit or prohibit trucks. On September 5, 2018 a revised 2nd TIA was submitted along with a response matrix to address review comments made. The project proposed is a warehouse development with a total of 67,465 square feet. Proposed completion is estimated to be 2019.

The site location is shown on Page 2 of the TIA in Figure 1, which is included as Attachment 1, and the site plan is shown on Page 3 in Figure 2 of the TIA, which is included as Attachment 2.

The proposal is for two driveways onto Ayala Drive. The driveways onto Ayala Drive are proposed as right in/right out access only and there is an existing raised median on Ayala Drive preventing left turns at the d...

Click here for full text