For the Planning Commission Meeting of January 9, 2019
TO: Honorable Chairman and Planning Commissioners
APPROVAL: Robb Steel, Assistant CA/Development Services Director
REVIEWED BY: Gina M. Gibson-Williams, Planning Manager
FROM: Daniel Casey, Senior Planner
Title
Conditional Development Permit No. 2018-0043: A request to allow up to a ten (10) percent increase in the permitted floor area ratio through the implementation of non-residential development incentives, as it relates to a proposal to develop a 99,999 square foot industrial warehouse building on 4.63 gross acres of land (APNs: 0240-181-32 & -33) located on the north side of Base Line Road approximately 315 feet east of Palmetto Avenue within the Employment (EMP) zone of the Renaissance Specific Plan. This project includes a Mitigated Negative Declaration (Environmental Assessment Review No. 2018-0024) for consideration in conjunction with the project.
Body
APPLICANT:
CDRE Holdings 11, LLC, 523 Main Street, El Segundo, CA 90245.
LOCATION:
The project site consists of two (2) parcels of land located on the north side of Base Line Road approximately 315 feet east of Palmetto Avenue (APNs: 0240-181-32 & -33) (Refer to the attached Location Map (Exhibit A)).
BACKGROUND:
Surrounding Land Use and Zoning
Location
Existing Land Use
Zoning
Site
Vacant Land
Employment (EMP)
North
Industrial Warehouse Building
Planned Industrial Development (I-PID)
East
Church
Employment (EMP)
South
Single-Family Residences
City of Fontana
West
Single-Family Residences
Employment (EMP)
General Plan Designations
Location
General Plan Designation
Site
Specific Plan with a Specific Plan Overlay (Renaissance SP)
North
Business Park with a Specific Plan Overlay (Rialto Airport SP)
East
Specific Plan with a Specific Plan Overlay (Renaissance SP)
South
City of Fontana
West
Specific Plan with a Specific Plan Overlay (Renaissance SP)
Site Characteristics
The project site is a relatively flat, rectangular-shaped piece of...
Click here for full text