File #: TC-19-234    Version: 1 Name:
Type: Agenda Item Status: Agenda Ready
File created: 2/19/2019 In control: Transportation Commission old
On agenda: 4/3/2019 Final action:
Title: Focused Traffic Impact Analysis (TIA) -Fuel Station and Convenience Market on the Southeast Corner of Riverside Avenue and Santa Ana Avenue. (ACTION ITEM)
Attachments: 1. Attachment 1 - Project Location Map.pdf, 2. Attachment 2 - Site Plan.pdf, 3. Attachment 3 - Project Trip Generation.pdf, 4. Attachment 4 - Summary of Off-Site Improvements & Costs.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
For Transportation Commission Meeting [April 3, 2019]
TO: Honorable Chairperson and Commission
APPROVAL: Robert G. Eisenbeisz, P.E., Public Works Director/City Engineer
FROM: Azzam Jabsheh P.E., T.E., Associate Civil Engineer

Title
Focused Traffic Impact Analysis (TIA) -Fuel Station and Convenience Market on the Southeast Corner of Riverside Avenue and Santa Ana Avenue.
(ACTION ITEM)

Body
BACKGROUND:
On April 16, 2018, the first scoping agreement was submitted for the proposed development at the southeast corner of Riverside Avenue and Santa Ana Avenue. On April 18, 2018, a 2nd Scoping Agreement was submitted. The proposed project is the construction of an 18 fueling position fuel station, and a super convenience market with drive thru. There will be 16 gasoline pumps and 2 diesel pumps for fueling. The first TIA was submitted on September 24, 2018, and it was reviewed with review comments prepared. On January 23, 2019, a revised second TIA was submitted to address review comments made on the first TIA. On March 18, 2019 a 3rd TIA was submitted addressing comments on the second review. The estimated completion is in 2020.

The site location is shown on Page 3 of the TIA in Figure 1, which is included as Attachment 1, while the site plan is shown on Page 4 in Figure 2 of the TIA, which is included as Attachment 2.

The site proposes two driveways. One driveway is on Santa Ana Avenue, designed as full access and located approximately 130 feet east of Riverside Avenue. The other driveway is on Riverside Avenue, located approximately 270 feet south of Santa Ana Avenue, designed as right in/right out only. Both driveways will be used for cars and trucks. The driveways are dimensioned at 50-feet wide with radius returns. Both sides of Riverside Avenue and Santa Ana Avenue are developed with curb and gutter but Riverside Avenue will require additional dedication and improvement for the ultimate 6-lane configuration. Both the south side of Santa Ana Aven...

Click here for full text