File #: CC-19-575    Version: 1 Name:
Type: Agenda Item Status: Agenda Ready
File created: 5/20/2019 In control: City Council
On agenda: 6/11/2019 Final action:
Title: Request City Council to Authorize Release of Request for Bids (RFB) for the Construction of the Frisbie Park Sewer Lift Station.
Sponsors: Susanne Wilcox
Attachments: 1. Attachment 2 - NOD Frisbie Park.pdf, 2. Attachment 1 - RFB - Frisbie Park Sewer LS.PDF
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
For City Council Meeting and Rialto Utility Authority [June 11, 2019]
TO: Honorable Mayor and City Council
APPROVAL: Sean Grayson, Interim City Administrator
FROM: Thomas J. Crowley, P.E., Utilities Manager

Title
Request City Council to Authorize Release of Request for Bids (RFB) for the Construction of the Frisbie Park Sewer Lift Station.

Body
BACKGROUND:
City Council appropriated budget from the General Fund in fiscal year 2015/2016 for design of existing undeveloped portions of Frisbie Park. Frisbie Park is located at 598 E. Easton Street. This 27.4 acre site is partially developed.

The park currently has two restroom buildings and a snack bar on two separate septic systems. The new park will include a third restroom building and an additional snack bar building. The City would like to connect restroom facilities at the Park to the sewer system. It is the goal of the City to abandon the existing septic systems and build a new sewer lift station that will accommodate the project. In addition, there is an eleven lot Tentative Tract Map (TTM) that is being considered adjacent to the park that would also be tributary to the proposed sewer lift station. The new sewer lift station is to be constructed on the east side of Eucalyptus Avenue, just south of the intersection of Easton Street.

This project will consist of the construction of a sewer lift station that will accommodate the flows from the park and the TTM. Approximately 600 linear feet of 8" VCP sewer line in Easton Street will collect the flows from the park facilities to the sewer lift station, approximately 1,000 linear feet of a 8" VCP sewer line in Eucalyptus Avenue will collect the flows for the eleven lot TTM, and 1,300 linear feet of force main in Eucalyptus Avenue will connect the sewer lift station to the existing sewer collection system. In addition, the sewer lift station will require a backup generator powered by diesel in the event there is loss of power to the site.

Th...

Click here for full text