File #: TC-20-0321    Version: 1 Name:
Type: Agenda Item Status: Agenda Ready
File created: 4/21/2020 In control: Transportation Commission
On agenda: 5/6/2020 Final action:
Title: Focused Traffic Impact Analysis - Fuel Station, Convenience Market and Fast Foods on the Southeast Corner of Alder Avenue and Renaissance Parkway. (ACTION ITEM)
Attachments: 1. Attachment 1 - Location Map.pdf, 2. Attachment 2 - Site Plan.pdf, 3. Attachment 3 - Project Trip Generation.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
For Transportation Commission Meeting [May 6, 2020]
TO: Honorable Chairperson and Commission
APPROVAL: Savat Khamphou, Public Works Director/City Engineer
FROM: Gene R. Klatt, Consultant Engineer, Lockwood Engineering

Title
Focused Traffic Impact Analysis - Fuel Station, Convenience Market and Fast Foods on the Southeast Corner of Alder Avenue and Renaissance Parkway.
(ACTION ITEM)

Body
BACKGROUND:
On June 25, 2019, the first scoping agreement was submitted for the proposed development at the southeast corner of Alder Avenue and Renaissance Parkway. On July 17, 2019, the Scoping Agreement was executed. The proposed project is the construction of a 16 fueling position fuel station, and a super convenience market with drive-thru fast food and a second fast food plus a third stand-alone fast food. There will be 16 gasoline pumps and 4 diesel fueling positions. Two fast foods, one with drive-thru will be adjacent to the 4,406 square foot convenience market with a third free standing fast food and drive-thru also on site. The first TIA was submitted on January 6, 2020, and it was reviewed with review comments prepared. On March 10, 2020, a revised second TIA was submitted to address review comments made on the first TIA. A third TIA was submitted April 7, 2020. The estimated completion is in 2020.

The site location is shown on Page E1 of the TIA in Exhibit 1-1, which is included as Attachment 1, while the site plan is shown on Page E2 in Exhibit 1- 2 of the TIA, which is included as Attachment 2.

The site proposes three (3) driveways. The driveway onto Renaissance Parkway is proposed as a right in/right out access driveway to be located approximately 200 feet east of Alder Avenue. The second and third driveways will be on Alder Avenue and, will be right in/right out access only on the northerly driveway approximately 300 feet south of Renaissance Parkway and right out only for the southerly driveway as the truck exits from the diesel pumps and will be ...

Click here for full text